Stuff To Read
It's not Winter so it must be Road Construction Season!

 

  Well, the snow seems to have officially left us for awhile so it's time to dust off the orange barrels and tear up some streets.

We'll keep this page up to date with a complete listing of road construction projects as they're provided to us by the city and state DOT folks.

If you plan on traveling and want to see if there is construction between you and your destination, you can visit the WI DOT Plans & Projects page.

Remember to slow down and pay closer attention when you're driving near road work.  Don't forget... if you're caught speeding in a construction zone, the fine is automatically DOUBLED.

If you come across a project that isn't listed here, we'd love to hear about it and add it to the site.  Just drop an Email to: KeithEdwards@ClearChannel.com


 Date(s)  Location   Project Description 
April 21-
Mid-November
Clairemont Ave-
Eau Claire
 Replace Pavement, Add Bike/Pedestrian Path. 
Speed Limit 35 MPH
Current-Sept. Highway 53 between
Chippewa Falls & Bloomer 
 Bridge Repair 
April 28-July 25 Hastings Way over Eau Claire River-Eau Claire  Bridge Improvements
April 28-TBA Gateway Drive  Pavement Replacement
April 28-TBA Keystone Crossing  Pavement Replacement
Current-TBA Hastings Way-from North Crossing to HWY J  Road Work
Speed Limit 40MPH
 May 1-TBA County Highway II (Deerfield Road)  from Highway 93-CTH F  Culvert replacement, and full asphalt overlay
April 28-May 23 County Highway D (northeast of Fall Creek)  Culvert replacement





 © 2008
TERMS OF USE | PRIVACY STATEMENT | COPYRIGHT and TRADEMARK NOTICE | EEO PUBLIC FILE | ADVERTISE WITH US
Some images on this site © 2008 Getty Images
Some images on this site © WireImage.com or WireImage.com contributing photographers